Check out our FAQ's on Inspection Services.
Call the automated Voice Permits™ IVR System for all of your Building/Fire Permit inspections, 24 hours a day!
(714) 738-6543
- Schedule inspections
- Cancel inspections
- Retrieve inspection results
To use the system you need:
- A touch-tone telephone (or the dialing keypad on your mobile phone)
- A site-specific permit number
- An inspection code (download the Guide or skip to the codes below)
Choose from the following options after dialing:
- Press 1 To schedule an inspection
- Press 2 To cancel an inspection
- Press 3 To obtain inspection results
- Press 0 To transfer to staff
- Press # To disconnect and hang up
- Press * For additional information anytime during the call
The Voice Permits™ system will prompt you through the steps below during your call.
You may perform multiple transactions during each call.
At the end of the call you will be issued a confirmation number. We recommend you keep a record of confirmation numbers.
Inspection Codes
STRUCTURAL | CODE |
STRUC/ FOUNDATION/ LOCI HARDWARE | 105 |
STRUCTURE PRE-SLAB/COMPACT | 110 |
STRUC-TILT UP PANELS | 121 |
BELOW GRADE DRAINAGE WTRPRF | 123 |
MASONRY/ GROUT LIFT | 120 |
FLOOR JOIST/ UNDERPINNING | 115 |
FLOOR SHEATHING | 116 |
ROOF SHEATHING | 130 |
EXT SHEAR PANEUHARDWARE | 135 |
INT SHEAR PANEL/ HARDWARE | 136 |
STRUC-FRAMING / MEPS | 140 |
INSULATION | 145 |
DRYWALL-1ST LAYER | 150 |
DRYWALL-2ND LA YER | 152 |
ACCESSIBILITY | 155 |
EXT LATH/FLASHING WEEP | 160 |
SHOWER PAN | 162 |
INTERIOR LATH | 161 |
T-BAR/ DRAFT | 164 |
SCRATCH COAT | 170 |
SPRAY BOOTH | 175 |
PLUMBING | |
UNDERGROUND SOIL | 205 |
UNDERGROUND WATER | 210 |
SEWER | 220 |
LEACH FIELD SEPTIC | 225 |
SUMP PUMP | 227 |
ROUGH PLUMBING | 230 |
YARD GAS PIPING | 235 |
GAS TEST | 240 |
GREASE INTERCEPTOR | 242 |
!WATER HEATER | 245 |
BOILER | 250 |
MECHANICAL | |
ROUGH | 310 |
AIR CONDITIONING | 325 |
KITCHEN HOOD | 350 |
DUCT WRAP | 360 |
BOILER | 370 |
ELECTRICAL | |
TEMP ELECTRICAi. POWER | 400 |
UNDERGROUND/ UFER/ BONDING | 405 |
ROUGH | 415 |
ELEC SERVICE | 420 |
PHOTOVOLTAIC SYSTEMS | 425 |
UNDERGROUND CONDUIT | 430 |
EV CHARGER | 440 |
BATTERY BACKUP | 450 |
POOLS AND SPAS | |
PRE-GUNITE | 505 |
BONDING | 540 |
PRE-DECK | 545 |
GAS/TEST | 547 |
UNDERGROUND ELEC | 560 |
UNDERGROUND PLUM | 561 |
BACKWASH P-TRAP | 565 |
PRE-PLASTER/ FENCE AND GATES | 570 |
FIRE DEPARTMENT | |
FIRE ACCESS | 600 |
OAS/BOA | 601 |
UNDERGROUND HYDRO PIPING | 605 |
UNDERGROUND FLUSH | 610 |
OVERHEAD HYDRO | 615 |
OVERHEAD ROUGH | 616 |
STANDPIPE HYDRO | 617 |
STANDPIPE FLOW/ FLUSH | 618 |
FIRE PUMP TEST | 619 |
SPRINKLER FINAL | 620 |
ALARM ROUGH F'IRE | 625 |
ALARM FINAL | 630 |
Al T AUTO F'IRE EXTINGUISHING SYS | 633 |
SPRAY BOOTH | 340 |
HOOD/ DUCT SYSTEM | 635 |
FIRE FINAL | 645 |
FIRE MISCELLANEOUS | 699 |
DEMO | |
BUILDING DEMO | 735 |
PLMG/ MECH/ ELEC REMOVAL | 715 |
SEWER CAP | 725 |
FOUNDATION | 745 |
POOL DEMO/ BOTTOM | 750 |
GRADING | |
GRADING.PRE GRADE MEETING | 801 |
BOTTOM | 812 |
ROUGH/ PAD CERT | 872 |
PRECISE/ PAD CERT | 875 |
MISCELLANEOUS | 965 |
FINAL INSPECTIONS | |
PLANNING FINAL | 977 |
SIGN FINAL | 955 |
ENG/WATER ENG FINAL | 988 |
BLDG FIRE FINAL | 945 |
LANDSCAPE FINAL | 995 |
DEMO FINAL | 994 |
GRADING FINAL | 993 |
PLUMBING FINAL | 996 |
MECHANICAL FINAL | 997 |
ELECTRICAL FINAL | 998 |
BUILDING FINAL | 999 |