Water Rate Study

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

The City of Fullerton is committed to providing safe, reliable, and affordable drinking water to more than 144,000 residents and the businesses we serve. The City operates more than 420 miles of pipe, maintains 67.5 million gallons of storage, monitors more than 100 compounds by taking 4,000 samples annually, and supplies over 8 billion gallons of water annually.

The City manages all of this with a deteriorating system that has aged beyond its useful service life. Most of these pipes and facilities were installed in the 1950s and 1960s with the oldest pipe dating back to 1914. Because of the age and deterioration of the system, City staff repairs an average of 100 pipeline breaks per year which are highly disruptive to our customers. Additionally, staff responds to and fixes multiple well and pump failures every year.

Water Rate Progress Report

This annual progress report is designed to provide an overall update on water-related capital improvement projects and revenue realized as a result of 2019 Water Rate Study and subsequent water rate changes effective in July 1, 2019.

2022 Water Rate Progress Report

Broken Pipelines

Why do a Water Rate Study?

The water rate study was completed in 2019 and includes a phased five-year rate increase. The programmed water rates were designed to meet anticipated maintenance and operation costs while providing sufficient funding for water system related upgrades and replacement projects.

As a public water provider, the City can only charge its customers for the costs associated with providing water service; the City cannot earn a profit. When determining the proposed water rates, the City prioritizes:

  • Treating all customers fairly and proportioning rates equitably
  • Reflecting the true cost of service
  • Maintaining legal defensibility
  • Protecting the water system’s financial stability and its ability to provide high-level service
  • Maintaining, upgrading and fixing aging pipelines, wells, pump stations, reservoirs, etc.
  • Ensuring sufficient reserves for emergencies

Water Rate Study FAQ

Reports & Presentations

The proposed water rates recommended by the Water Rate Study Ad Hoc Committee were approved by City Council in 2019.

Water Rate Study Ad Hoc Committee

City staff worked with a Water Rate Study Ad Hoc Committee (made up of six at-large Fullerton residents that served on the Energy and Resource Management Committee and the Citizens’ Infrastructure Review Committee) to review the water system, its funding, and evaluate multiple alternative capital improvement program (CIP) project schedules. These CIP alternatives were studied with the goal of balancing the need to address critical pipeline and well replacement while minimizing water rate increases.

Eight Ad Hoc Committee meetings were held from August 2018 through March 2019. The public was invited to attend all meetings including an evening meeting held on December 5, 2018 to allow for more public input.

Capital Improvement Programs

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer